Home » Honeywell to provide control valves for Qatar gas-to-liquid operation
Honeywell to provide control valves for Qatar gas-to-liquid operation
11/06/2007
Seoul, South Korea, Nov. 6, – Honeywell today announced a $9.1 million agreement to provide control valves for the new integrated Pearl Gas-to-Liquids (GTL) plant in Qatar, a partnership between Qatar Shell GTL Ltd. (Shell) and Qatar Petroleum. The project’s main engineering, procurement and construction (EPC) contractor, Hyundai Engineering and Construction Co. (HDEC), selected Honeywell for its ability to serve as the single supplier of the plant’s general purpose, rotary and severe application valves.
“Many vendors only manufacture certain types of control valves, but Honeywell was the logical choice because of its comprehensive offering. It can supply all three valves, which makes the project implementation much more efficient,” said H. S. Joo, C & I Manager for Hyundai Engineering & Construction Co., Ltd. “Additionally, Honeywell has a proven track record of turning projects quickly, which is a critical factor for a project of this magnitude.”
Located about 53 miles north of Doha in the industrial city of Ras Laffan, the Pearl GTL facility will include two gas platforms and an onshore GTL plant that is expected to produce 140,000 barrels per day of GTL products, including naphtha and transport fuels. GTL products are considered environmentally friendly because they are virtually free of sulfur, nitrogen and aromatics.
“Pearl GTL will be a high-profile operation for Shell and an economic asset to Qatar, so HDEC must adhere to a tight project schedule to ensure maximum production,” said Simon Park, regional general manager for Honeywell Process Solutions Korea. “Having a single source provide controls to control valves for the implementation can significantly streamline the process and help contractors like HDEC meet aggressive schedules.”
Within the past two years, Honeywell also was chosen to provide Front-End Engineering Design (FEED) services, as well as the process automation and control systems for the Pearl GTL facility. Honeywell solutions for GTL plants help improve process profitability and achieve enterprise-wide integration. This allows customers to dynamically integrate corporate priorities and changing business conditions into their gas-plant decision making and production schedules.
More News:
-
02/03/2012
Online Measurement Will Drive Liquid Analytical Market to $1 Billion by 2014
Study from Flow Research Finds That the Worldwide Market for Leading Liquid Analytical Instruments Is Projected to Grow
-
02/01/2012
Shell Scotford Upgrader Named 2011 HART Plant of the Year
Engineers Get Connected to HART Communication to Facilitate Loop Testing, Start-Up, Valve Tuning, Safety Systems and Remote Device Diagnostics
-
01/25/2012
Magnetrol's Eclipse Model 705 Receives SIL 3 Certification
exida awards Magnetrol International's Eclipse Model 705 Guided Wave Radar Transmitter as Safety Integrity Level (SIL) 3 capable per IEC 61508
-
01/25/2012
Fieldbus Foundation To Hold 2012 General Assembly
This year's General Assembly, scheduled for March 6-8 in Brazil, is themed, "In a World of Choices, FOUNDATION Brings it all Together"
-
01/24/2012
Video Explains Interface Detection for Air, Oil and Gas
Video Explains Interface Detection for Air, Oil and Gas With Thermal Flow Switches In Petrochemical Applications
-
01/19/2012
Siemens Becomes Strategic Process Automation Partner for Dow Corning
The Global Supply Contract will feature Siemens Simatic PCS 7 as the strategic platform for Dow Corning's batch, continuous and discrete process automation solutions
-
01/19/2012
Honeywell's 2012 Student Competition Now Expanded Across Asia Pacific
Honeywell's 2012 Student Competition to Include Entries from Korea, India, Japan, China, South East Asia, Australia and New Zealand
-
01/16/2012
Metso DNA Automation System Increases Efficiency, Operational Knowledge and Control
Metso's New DNA applications for power generation industries
-
01/16/2012
Steam Energy 2012 Training Course Schedule
Spirax Sarco releases 2012 steam energy training course schedule
-
01/16/2012
Custom Cabinetry and Millwork for Control Room Installations
Winsted Launches New Custom Wood Division
- All news »
Sponsored Links
Control Digital Edition
Access the entire print issue on-line and be notified each month via e-mail when your new issue is ready for you. Subscribe today.
- Featured White Papers

Print page