Home » Siemens Power Generation secures follow-up contract for power plant services
Siemens Power Generation secures follow-up contract for power plant services
11/26/2007
Erlangen, Germany, Nov. 26 -- Siemens Power Generation (PG) has received an order from Britain for the extension of an existing maintenance agreement for the Peterhead power plant in Scotland. Purchaser is SSE Generation Limited, a subsidiary of the British utility Scottish and Southern Energy Ltd. (SSE). Prior to expiration of the existing service agreement, the customer has thus opted for a premature extension with an expanded scope of supply and guarantees. The term of the new agreement is 18 years.
The Peterhead combined cycle power plant has an installed capacity of approximately 1200 megawatts (MW). Siemens PG built the plant as a turnkey project in 2000 and immediately assumed responsibility for gas turbine services. The scope of supply for the extended agreement includes services for the three SGT5-4000F gas turbines and the generator, and the supply of components for the electrical and instrumentation and control systems. The agreement also covers gas turbine upgrades to bring them in line with the latest state of the art. That will not only uprate the gas turbines and increase overall power plant efficiency but will also maintain the plant’s already high availability.
"With the development of various upgrade options Siemens has in recent years made decisive advances in modernization and optimization of the installed gas turbine fleet and thus made an important contribution toward efficient, environmentally friendly power plant operation," said Matthew Chinn, head of service business for the regions Europe and Africa at Siemens PG.
More News:
-
02/03/2012
Online Measurement Will Drive Liquid Analytical Market to $1 Billion by 2014
Study from Flow Research Finds That the Worldwide Market for Leading Liquid Analytical Instruments Is Projected to Grow
-
02/01/2012
Shell Scotford Upgrader Named 2011 HART Plant of the Year
Engineers Get Connected to HART Communication to Facilitate Loop Testing, Start-Up, Valve Tuning, Safety Systems and Remote Device Diagnostics
-
01/25/2012
Magnetrol's Eclipse Model 705 Receives SIL 3 Certification
exida awards Magnetrol International's Eclipse Model 705 Guided Wave Radar Transmitter as Safety Integrity Level (SIL) 3 capable per IEC 61508
-
01/25/2012
Fieldbus Foundation To Hold 2012 General Assembly
This year's General Assembly, scheduled for March 6-8 in Brazil, is themed, "In a World of Choices, FOUNDATION Brings it all Together"
-
01/24/2012
Video Explains Interface Detection for Air, Oil and Gas
Video Explains Interface Detection for Air, Oil and Gas With Thermal Flow Switches In Petrochemical Applications
-
01/19/2012
Siemens Becomes Strategic Process Automation Partner for Dow Corning
The Global Supply Contract will feature Siemens Simatic PCS 7 as the strategic platform for Dow Corning's batch, continuous and discrete process automation solutions
-
01/19/2012
Honeywell's 2012 Student Competition Now Expanded Across Asia Pacific
Honeywell's 2012 Student Competition to Include Entries from Korea, India, Japan, China, South East Asia, Australia and New Zealand
-
01/16/2012
Metso DNA Automation System Increases Efficiency, Operational Knowledge and Control
Metso's New DNA applications for power generation industries
-
01/16/2012
Steam Energy 2012 Training Course Schedule
Spirax Sarco releases 2012 steam energy training course schedule
-
01/16/2012
Custom Cabinetry and Millwork for Control Room Installations
Winsted Launches New Custom Wood Division
- All news »
Sponsored Links
Control Digital Edition
Access the entire print issue on-line and be notified each month via e-mail when your new issue is ready for you. Subscribe today.
- Featured White Papers

Print page