Home » ABB to supply world’s longest underground cable system
ABB to supply world’s longest underground cable system
01/04/2012
ZURICH – ABB has won an order worth around $160 million from Svenska Kraftnät, the national grid operator, to provide a new high-voltage underground cable system for the South-West Link power transmission project in southern Sweden. When completed in 2014, this will be the longest and most powerful underground cable link in the world. The order was booked in the fourth quarter of 2011.
The main objective of the new transmission system is to enhance capacity and strengthen the reliability of the national power grid. It will help boost transmission capacity in the south of the country and between Sweden and Norway. The link will also facilitate the future integration of large-scale wind power into the Swedish power network.
ABB's underground HVDC (high-voltage direct current) cable system will have the capacity to transport 2 x 660 megawatts (MW) of electric power at a voltage level of 300 kilovolts (kV) across a distance of about 200 kilometers between Barkaryd and Hurva in southern Sweden. ABB is responsible for the design, engineering, manufacture, supply and installation of the entire cable system, including terminations, joints and other accessories.
"This cable solution will boost power capacity, facilitate power exchange and help integrate more renewable energy," said Peter Leupp, head of ABB's Power Systems division. "It will also reduce the impact of power system disturbances and contribute to the stability and reliability of the grid."
More News:
-
05/21/2013
ISA Training Through June in Houston
Technician training, engineering survival and SIS boot camps for condensed, intense, comprehensive educational experience.
-
05/20/2013
NIST Releases Initial Cyber Security Framework Comment Analysis
The National Institute for Standards and Technology has released an initial analysis of the hundreds of comments by industry and the public they have received on the Obama Administration's "Improving Critical Infrastructure Cyber Security" executive order.
-
05/20/2013
Past Time to Upgrade Your DCS?
Upgrading Your DCS: Why You May Need to Do It Sooner Than You Think
-
05/20/2013
Metso Provides New Heating Solution for Finnish Utility
Finland's largest pellet-fired heating plant produces environmentally friendly energy in Tampere
-
05/20/2013
K-BIM Consortium Selects Siemens' Parasolid for New AEC Applications
-BIM, a consortium of commercial, academic and government organizations wants the new application suite to help create a national standard for building information management (BIM)
-
05/17/2013
Friday p.m. Wrap-Up:This Week on ControlGlobal and Elsewhere
Some of the week's biggest stories in process automation
-
05/16/2013
What's Bad Weather Costing Us?
U.S. taxpayers paid nearly $100 billion responding to damages caused by last year’s extreme weather events associated with climate change, about $1,100 per taxpayer, according to an analysis by the Natural Resources Defense Council (NRDC).
-
05/16/2013
BP, Shell, Statoil Raided by EC
European Commission investigators raided the offices of oil companies BP, Royal Dutch Shell and Statoil as well as data collector Platts as part of a larger inquiry into price manipulation of the global crude market.
-
05/15/2013
What We Can Learn About Safety from the Titanic Hearings
This report from the U.K. publication The Engineer is instructive. It reprints a report from the May, 1912 hearings on the sinking of the Titanic.
-
05/15/2013
Invensys' SimSci Suite 2013 Now with More Usability Features
Invensys releases SimSci Suite 2013, a DVD catalogue providing a single source for all of Invensys' current SimSci-Esscor design, operator training, simulation and optimization software
- All news »
Sponsored Links
Control Digital Edition
Access the entire print issue on-line and be notified each month via e-mail when your new issue is ready for you. Subscribe today.
- Featured White Papers
Print page