Home » ABB gets $1-billion wind farm deal
ABB gets $1-billion wind farm deal
08/03/2011
Zurich -- ABB has won an order worth around $1 billion from the Dutch-German transmission grid operator TenneT to supply a power link connecting offshore North Sea wind farms to the German mainland grid.
This is the largest power transmission order in ABB's history. It will deploy the world's largest offshore HVDC (high-voltage direct current) system with a rating of over 900 megawatts (MW), keeping electrical losses to less than 1% per converter station. The completed link will be capable of supplying more than 1.5 million households with clean wind-generated electricity.
ABB will design, engineer, supply and install the offshore platform, the offshore and onshore converter stations, and the land and sea cable systems. ABB's innovative and environmentally friendly HVDC Light transmission technology will transport power from the 400 MW Gode Wind II and other wind farms to an offshore HVDC converter station, which will transmit the electricity to the onshore HVDC station at Dörpen on the German coast via 135 kilometers of underwater and underground cables. A converter station here will feed electricity into the mainland grid.
"Offshore wind power is emerging as a major source of large-scale renewable energy in Europe to help meet emission targets and lower environmental impact," said Peter Leupp, head of ABB's Power Systems division. "ABB is uniquely positioned with in-house manufacturing capability of converter stations, cables and semiconductors, the essential components of HVDC systems, and has invested significantly in these technologies."
ABB's HVDC Light transmission technology offers environmental benefits such as neutral electromagnetic fields and compact converter stations. It is ideal for connecting remote offshore wind farms to mainland networks and overcoming distance limitations and grid constraints, while ensuring minimal electrical losses and efficient performance. The 320-kilovolt cable voltage capacity in this latest system is the highest level used for HVDC transmission with extruded cables.
Scheduled to be operational in 2015, this offshore network will help to avoid more than three million tons of carbon dioxide emissions per year by replacing fossil-fuel based generation. Germany's installed wind power capacity of over 27 gigawatts presently meets about eight percent of its electricity requirements. Plans are to double that by 2020. This is the third offshore wind connection order for ABB in Germany, following the 800 MW Dolwin1 link awarded last year and previously the BorWin1 project.
ABB provides a wide range of products, systems and services that enable the efficient generation and integration of renewable wind energy into the grid and its reliable transmission and distribution.
More News:
-
05/22/2013
Great Moments in Process Automation History
Take a broken soda fountain machine, a car a.c. unit, flavor mixes, water and CO2, add inventiveness; you get America’s favorite frozen drink.
-
05/22/2013
Smart Grid: Independent Testing Of Rossi's E-Cat Cold Fusion Device Shows Positive Results
Forbes magazine's tech contributor Mark Gibbs writes that independent testing of Andrea Rossi's E-CAT Cold Fusion Reactor has positive results.The implications of the possible commercialization of cold fusion power sources are incredible.
-
05/21/2013
Compressor Controls: Saudi Aramco Buys First GE Compressor Control Systems
Saudi Aramco has purchased advanced compressor control technology from GE for the Haradh GOSP-1 facility in Saudi Arabia's Eastern Province.
-
05/21/2013
SANS Control Security Training Coming to Houston
SANS Institute will hold ICS Security Training event on June 10-15 in Houston
-
05/21/2013
ISA Training Through June in Houston
Technician training, engineering survival and SIS boot camps for condensed, intense, comprehensive educational experience.
-
05/20/2013
Past Time to Upgrade Your DCS?
Upgrading Your DCS: Why You May Need to Do It Sooner Than You Think
-
05/20/2013
Metso Provides New Heating Solution for Finnish Utility
Finland's largest pellet-fired heating plant produces environmentally friendly energy in Tampere
-
05/20/2013
NIST Releases Initial Cyber Security Framework Comment Analysis
The National Institute for Standards and Technology has released an initial analysis of the hundreds of comments by industry and the public they have received on the Obama Administration's "Improving Critical Infrastructure Cyber Security" executive order.
-
05/20/2013
K-BIM Consortium Selects Siemens' Parasolid for New AEC Applications
-BIM, a consortium of commercial, academic and government organizations wants the new application suite to help create a national standard for building information management (BIM)
-
05/17/2013
Friday p.m. Wrap-Up:This Week on ControlGlobal and Elsewhere
Some of the week's biggest stories in process automation
- All news »
Sponsored Links
Control Digital Edition
Access the entire print issue on-line and be notified each month via e-mail when your new issue is ready for you. Subscribe today.
- Featured White Papers
Print page