Warning: Unknown: Unable to allocate memory for pool. in Unknown on line 0

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/www.controlglobal.com/industrynews/2012/honeywell-solar-power-plant-spain.html on line 28

Warning: require() [function.require]: Unable to allocate memory for pool. in /www/pro/htdocs/scripts/include.php on line 377

Warning: require_once() [function.require-once]: Unable to allocate memory for pool. in /www/pro/htdocs/scripts/include.php on line 399

Warning: session_start() [function.session-start]: Cannot send session cookie - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 899

Warning: session_start() [function.session-start]: Cannot send session cache limiter - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 899

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 531

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 532

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 533

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 534

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template.php on line 33

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template-subtheme.php on line 10

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/controlglobal/template.php on line 56

Warning: array_key_exists() [function.array-key-exists]: The second argument should be either an array or an object in /www/pro/htdocs/community/includes/module.inc on line 217

Warning: array_key_exists() [function.array-key-exists]: The second argument should be either an array or an object in /www/pro/htdocs/community/includes/module.inc on line 217

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/controlglobal/template.php on line 85

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template.php on line 36

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template.php on line 39
Sustainability: Torresol Energy Select Honeywell to Optimize Thermo Solar Plants in Spain
Log In Register
Print page

Home » Torresol Energy Select Honeywell to Optimize Thermo Solar Plants in Spain

Torresol Energy Select Honeywell to Optimize Thermo Solar Plants in Spain

ControlGlobal.com
08/29/2012

Torresol Energy, a leader in the concentrated solar power (CSP) sector, has selected Honeywell's UniSim Operator Training Simulator (OTS) and business support planning tools to help optimize the performance of three of its thermo solar power plants in Spain.

Torresol Energy will also use Honeywell's UniSim OTS, to train the plants operators and engineers how to respond to a wide range of potential plant incidents, enabling them to react more quickly and diffuse issues before they occur. With UniSim Operations, Torresol will be able to identify, document and track changes to operational procedures and capture operator experience and best-practices as part of a sustainable operator competency plan.

Torresol Energy will use Honeywell's business support planning tools to create a model for operational performance of thermo solar power plants focussed around safe, reliable and efficient plant operation. The technology will be applied to three key projects sites:

  • The innovative 19.9 MW Gemasolar plant, located near Seville
  • Plants one and two of the 2x50 MW Valle facility, located in San José del Valle, near Cadiz.

According to Juan Ignacio Burgaleta, director of technology, Torresol Energy, they selected Honeywell for this project  because Honeywell has demonstrated a strong understanding of Torresol Energy's business and of thermo solar technology processes. "Honeywell has also developed a compelling proposition for safe, reliable and efficient energy production," said Burgaleta.

More News:


More content on this topic:

Free Subscriptions

Control Digital Edition

Access the entire print issue on-line and be notified each month via e-mail when your new issue is ready for you. Subscribe today.