Faster … cheaper … better. These are the terms increasingly used to describe the goals for project execution and plant operations. In addition, projects continue to grow, both in size and complexity. Given these drivers, larger projects are executed in a global setting with engineering companies and suppliers participating from all over the world.
It is simply impossible to meet these challenges using traditional CAD, older technology, or unproven engineering solutions.
Engineering is teamwork. Likewise, creating solutions involves teamwork. Intergraph has joined forces with Endress+Hauser (E+H) to provide a state-of-the-art engineering solution. This unique offering combines the market-leading engineering tool Intergraph SmartPlant® Instrumentation and the market-leading instrument supplier E+H. This "1+1=3" solution will benefit both engineering companies and plant
owners to meet and exceed their business goals.
One of the most time-consuming tasks during the engineering of a process plant is the specification, selection, and application of field instrumentation. It is not the most expensive component in the plant
and is often dealt with as a commodity.
But in a mid-sized refinery, there may be as many as 5,000 devices that need to be specified. At least
10 percent of these devices are installed in critical applications. For example, the devices control plant shutdown when dangerous conditions are detected. Other devices are used for the primary control of
the process and the final product quality.
It's absolutely essential to ensure that each device is correctly selected according to its application. For these reasons, the detailed engineering and documentation of instrumentation can sometimes account
for as much as 30 percent of plant design time.
In the early design phase of a plant, process engineers specify the need for instrumentation and note the requirements on P&ID drawings. Instruments are assigned to the different tasks required, whether control or simple monitoring. This enables a first estimation of cost. But when detailed engineering takes place, the instrument engineer must document each measuring point on a specification sheet and collate with it the respective documentation and drawings associated with each individual tag.
Initially, the specification sheet has base application information, plus tag and location data attached. The sheet is populated with as much process data as possible at this stage. Completing each specification sheet can typically take one to two hours. This document is the basis for sizing, selection, and pricing of the optimal measurement instrument.
The remainder of the specification document contains device-specific data following the selection of
a suitable supplier. This task often adds another hour of the engineer’s time, because the respective
data must be researched from the manufacturer’s datasheets and manually added.
A joint development by Intergraph and E+H now makes it possible for SmartPlant Instrumentation
to automate a large part of this process by exchanging the specification sheets electronically. This reduces engineering time because once a device has been selected, the supplier’s system automatically populates the specification sheet and attaches all of the respective technical documentation and sizing calculations. This eliminates the need for manual entry, reduces data transfer errors, and can save an estimated more than one hour of engineering time per device. In a plant with 5,000 instruments, this can quickly bring huge savings in engineering time.
Download the entire document to learn more.
More News:
-
05/15/2013
Alarm Mobility Increases Hydro Plant Reliability
integrating the TopView Alarm Notification Software with the SCADA System, Operators Are Now Able to Receive Alarm Messages in Real-Time on Their Cell Phones and Can Acknowledge These Alarms from Anywhere
- 05/09/2013 groov gets IOS and Android apps
- 05/01/2013 Swagelok publishes comprehensive sampling systems reference book
- 05/01/2013 Krohne provides instrumentation for Chobani plant
- 04/19/2013 Attendees Learn About Suppliers' Latest Foundation Products
- 04/19/2013 Huang Buyu, Now Retired from Sinopec SEI, Is Honored
- 04/19/2013 Dave Glanzer Addresses General Assembly Attendees
- 04/19/2013 FOUNDATION Fieldbus-Certified Training Center
- 04/19/2013 FOUNDATION Fieldbus Technology Helps Power Company Save
- 04/19/2013 Foundation for Remote Operations Management (ROM) Provides an Extended Information Architecture
- All news »
Sponsored Links
Control Digital Edition
Access the entire print issue on-line and be notified each month via e-mail when your new issue is ready for you. Subscribe today.
- Featured White Papers
Print page