Voices: Hebert

Calibration Can Be Condition-Based

Calibrating Industrial Devices Only as Needed Is the Better Method, and That Requires Automating the Calibration Process

By Dan Hebert

Process plants abound with instruments, analyzers and control valves, all of which need calibration to ensure performance as designed. Many plants calibrate these devices at fixed intervals, but that's less than optimal for a number of reasons. First, it's expensive, as many devices can operate within parameters on extended calibration schedules.

Second, it can result in poor operating performance, as some critical instruments should be calibrated more frequently. Third, plant safety can be compromised if safety-related devices drift out of calibration between intervals.

Calibrating each device only as needed is the better method, and that requires automating the calibration process. Smart devices can provide information to an asset management system (AMS) or a calibration management system (CMS) over a digital data link. These systems use this information to determine optimal calibration intervals. They also send data to documenting calibrators, which are used to calibrate the devices. After calibration, these calibrators upload the "as left" condition of the device to the system.

Here's how it works in practice. "Our customer GlaxoSmithKline (GSK) has a pharmaceutical manufacturing plant in Cork, Ireland, with more than 4000 control loops with HART and Foundation fieldbus," says Laura Briggs, the product manager for asset optimization at Emerson Process Management.

Also Read "Why calibration measurement software?"

Plant personnel were routinely calibrating instruments that did not need the same level of attention as devices that were critical to product quality or safety. To determine which instruments could be moved from the periodic schedule to on-demand calibration, they examined the diagnostics generated by every smart field device and digital valve positioner using Emerson's AMS Suite predictive maintenance software. They began monitoring a select group of less critical instruments, waiting for them to indicate that a change had taken place internally requiring attention. As time progressed, all of the smart devices were migrated to on-demand calibration.

Streamlining regular calibration procedures is based on optimizing the plant's periodic calibration schedules using documenting calibrators and synchronizing instrument data between Beamex's CMX CMS and Emerson's AMS Suite. Calibration data on every instrument is stored and downloaded directly to a portable calibrator for use by a technician in the field. When the scheduled calibrations are completed, the results are uploaded for certification and documentation.

"Savings due to this paperless calibration procedure were 15 minutes cut from each calibration, 21,000 sheets of paper eliminated each year and more than 500 hours per week of manual data entry time eliminated, along with potential errors," notes Briggs.

GSK also extended the interval between calibrations to reduce the overall number of procedures done annually while remaining in compliance with corporate policy and government regulations. The company achieved this through an ongoing, computer-driven analysis of historical data to identify instruments that didn't need to be calibrated as often, resulting in an 8% reduction in scheduled calibration.

Substantial upfront effort is required for any calibration optimization project. "The most time-consuming aspect of getting started isn't the acquisition cost of the equipment or software, but rather populating and setting up the AMS or CMS software with the information from the critical tags and their calibration attributes," explains Jim Shields, process tool marketing manager, Fluke.

"Once the CMS is populated, the data can be mined to make more educated determinations of instances where maintenance intervals can be adjusted," Shields adds. "Most CMS packages have tools for drift plot analysis to help examine the performance of a device, its errors and drift since its last calibration. If these or other tools show a device is performing reliably, then it's a good candidate for an extended maintenance interval."

More from this voice

Title

Measuring Viscosity With Coriolis Flowmeters

It Can Be Deduced From the Excitation Coil Current

05/14/2003

Technically speaking: Will standards mesh?

Reliability, scalability and mobility are the trump cards of wireless mesh networks and should result in triumph over other wireless topologies, according to Senior Technical Editor Dan Hebert, PE.

10/24/2004

Process controllers don't do windows

Embedded operating systems dominate the process control market, but this soon could change according to Senior Technical Editor Dan Hebert in his monthly Technically Speaking column for CONTROL.

02/22/2005

Make your automation processes better

There is no lack of technologies available that can improve your automation systems. The trick is to find, evaluate, and implement them without spending an inordinate amount of time, or taking on too much risk.

05/20/2005

An alarming situation

Alarm systems of one type or another always have been part of industrial machine, robot, and skid control systems, but CONTROL Senior Technical Editor Dan Hebert, PE, notes that there's more to alarm technology than meets the eye ... or ear for that matter.

06/05/2005

Applied control theory moves out

Industry group gets automation industry support from companies that believe the partnership between industry and academia is most beneficial when theory moves out of the classroom and into the plant.

06/20/2005

Do you need a single-source middleware solution?

As integrated middleware solutions vie with best-of-breed products, Senior Tech Editor Dan Hebert wonders if there will ever be a true integrated solution that covers the entire middleware space?

07/21/2005

Use RFID to improve your automation systems

Senior Technical Editor Dan Hebert, PE, addresses RFID technology and explains how RFID systems are being lnked to process automation systems to deliver process improvements.

08/22/2005

Fiber optic sensors on the horizon

The spread of fiber optic sensor technology from the laboratory into everyday use has barely begun. It's slashed the cost of communications, and may be poised to do the same for sensing applications.

09/27/2005

Into the mesh

Senior Tech Editor Dan Hebert, PE, identifies the leading candidates for best system architecture supremacy in the wireless arena and believes software algorithms will be key for high bandwidth mesh networks.

10/19/2005

Is advanced control ready for Prime Time?

Fuzzy logic can minimize false alerts without compromising detection and notification of actual events, but there is always a tradeoff between sensitivity and increasing likelihood of false notification.

11/10/2005

Old flywheel technology finds new uses

Read how high-tech flywheels can be used in place of batteries in process plant UPSs when backup power is needed during short-term disturbances and to ride through from utility to generator power.

12/21/2005

Web mash-ups: 1+1=3

CONTROL Senior Tech Editor Dan Hebert, PE, takes an in-depth look at a new web technology that will affect how you'll use the Internet, and how this latest trend could be applied to automation.

01/16/2006

Standards bring order to chaos

Implementation of the New Sampling/Sensor Initiative (NeSSI) standards will simplify sample system design, installation and operation, fundamentally changing and improving the way we do process analysis.

02/10/2006

HMI software is disappearing

Senior Tech Editor Rich Merritt takes a look at the HMI marketplace and finds today's software packages are getting better and cheaper, but are increasingly disappearing into control system vendors' portfolios.

02/13/2006

The right tool for the job

The next horizon for portable HMI applications may be the cell phone, which is cheap, ubiquitous, and produced in larger annual quantities than any consumer electronics device in history.

03/20/2006

Data logger size matters

New requirements and regulations are constantly being foisted on you and your plant, and many of these requirements necessitate acquisition and recording of data. Compact data loggers offer a solution.

04/17/2006

PC-based control infiltrates process plants

As PC-based control becomes more widespread in process plants, often via purchased machines and process skids, companies are finding it's a short step to implementing it for control over critical processes.

05/15/2006

Who should do your next project?

Senior Tech Editor Dan Hebert, PE, takes a look at ways you can make an automation contractor selection based on project size, scope, and support requirements in this installment of Technically Speaking.

06/12/2006

Who should do your next project? Part 2

In part two of this two-part series, Senior Tech Editor Dan Hebert, PE, takes a look at how your company’s own internal capabilities and characteristics can affect automation contractor selection.

07/14/2006