Voices: Hebert

Calibration Can Be Condition-Based

Calibrating Industrial Devices Only as Needed Is the Better Method, and That Requires Automating the Calibration Process

By Dan Hebert

Process plants abound with instruments, analyzers and control valves, all of which need calibration to ensure performance as designed. Many plants calibrate these devices at fixed intervals, but that's less than optimal for a number of reasons. First, it's expensive, as many devices can operate within parameters on extended calibration schedules.

Second, it can result in poor operating performance, as some critical instruments should be calibrated more frequently. Third, plant safety can be compromised if safety-related devices drift out of calibration between intervals.

Calibrating each device only as needed is the better method, and that requires automating the calibration process. Smart devices can provide information to an asset management system (AMS) or a calibration management system (CMS) over a digital data link. These systems use this information to determine optimal calibration intervals. They also send data to documenting calibrators, which are used to calibrate the devices. After calibration, these calibrators upload the "as left" condition of the device to the system.

Here's how it works in practice. "Our customer GlaxoSmithKline (GSK) has a pharmaceutical manufacturing plant in Cork, Ireland, with more than 4000 control loops with HART and Foundation fieldbus," says Laura Briggs, the product manager for asset optimization at Emerson Process Management.

Also Read "Why calibration measurement software?"

Plant personnel were routinely calibrating instruments that did not need the same level of attention as devices that were critical to product quality or safety. To determine which instruments could be moved from the periodic schedule to on-demand calibration, they examined the diagnostics generated by every smart field device and digital valve positioner using Emerson's AMS Suite predictive maintenance software. They began monitoring a select group of less critical instruments, waiting for them to indicate that a change had taken place internally requiring attention. As time progressed, all of the smart devices were migrated to on-demand calibration.

Streamlining regular calibration procedures is based on optimizing the plant's periodic calibration schedules using documenting calibrators and synchronizing instrument data between Beamex's CMX CMS and Emerson's AMS Suite. Calibration data on every instrument is stored and downloaded directly to a portable calibrator for use by a technician in the field. When the scheduled calibrations are completed, the results are uploaded for certification and documentation.

"Savings due to this paperless calibration procedure were 15 minutes cut from each calibration, 21,000 sheets of paper eliminated each year and more than 500 hours per week of manual data entry time eliminated, along with potential errors," notes Briggs.

GSK also extended the interval between calibrations to reduce the overall number of procedures done annually while remaining in compliance with corporate policy and government regulations. The company achieved this through an ongoing, computer-driven analysis of historical data to identify instruments that didn't need to be calibrated as often, resulting in an 8% reduction in scheduled calibration.

Substantial upfront effort is required for any calibration optimization project. "The most time-consuming aspect of getting started isn't the acquisition cost of the equipment or software, but rather populating and setting up the AMS or CMS software with the information from the critical tags and their calibration attributes," explains Jim Shields, process tool marketing manager, Fluke.

"Once the CMS is populated, the data can be mined to make more educated determinations of instances where maintenance intervals can be adjusted," Shields adds. "Most CMS packages have tools for drift plot analysis to help examine the performance of a device, its errors and drift since its last calibration. If these or other tools show a device is performing reliably, then it's a good candidate for an extended maintenance interval."

More from this voice

Title

Stop wasting money on backup power

The most prudent and cost-effective strategy for dealing with power-quality events is to protect against relatively frequent, short-term voltage sags as opposed to much rarer power outages.

08/10/2006

Welcome to the Bus Wars, Part Tres

You may not be aware, but a new bus war is being waged in your plant — the battle of the motion networks. Senior Tech Editor Dan Hebert, PE, provides analysis and commentary on the newest battle over fieldbus.

09/01/2006

User-friendly advanced control

Senior Tech Editor Dan Hebert, PE, looks at the latest advances in simulation and modeling technologies for improved loop control, including new software packages and embedded APC systems.

10/26/2006

Analyzers not ready for prime time

It is easy to see why the analyzer market doesn’t work for end users, but it is harder to find a solution. Clues can be found, however, in one small part of the analyzer market that is improving rapidly.

11/02/2006

AutomationXchange event report

While basic plant-floor automation is no longer a mystery, advanced control often is, making techniques for solving difficult process control problems of high interest to end users and service providers.

12/14/2006

Alarm management improves plant operations

Alarm management is a hot topic, perhaps because incorrect presentation of alarms often confuses operators. This article shows how better alarm management empowers operators to improve plant performance.

01/05/2007

Digital fieldbus networks

It's not so easy to deploy digital fieldbus networks in existing process plants. Working to upgrade from discrete and analog connections to digital fieldbus networks presents a host of options and challenges.

02/01/2007

Data access from everywhere

Limitations have kept mobile data access on the tradeshow floor and out of most process plants, but things are changing for the better because of a number of hardware and software tools that are making it practical.

03/08/2007

Why calibration measurement software?

Field calibration is faster and more accurate with digital calibrators and a CMS, but there’s a catch. Senior Tech Editor Dan Hebert, PE, reports on the state of the art in calibration systems for the operator.

04/06/2007

The skinny on PC-based control systems

In this column, Senior Tech Editor Dan Hebert, PE, takes a look at why a process skid manufacturer thinks PC-based control makes sense for its—and other—process applications.

05/07/2007

Fieldbus in hazardous areas

Digital fieldbus networks have created new options for installing devices in hazardous areas by simplifying implementation of IS systems and avoiding explosion-proof enclosure conduit systems.

06/08/2007

Mission Control

Custom-built command-and-control centers are an expensive option, but they provide concrete benefits.

07/15/2007

A Too-Smart Solution?

The benefits of installing smart metering systems in the plight of utilities are clear, but implementation is complex.

08/01/2007

Sparky, Sparky, Zap!

Neither spark-gap devices nor silicon avalanche diodes are a good fit for protecting process-plant electronics.

08/30/2007

How Good is OPC-UA, Really?

Even after consulting the experts, it’s hard to tell if OPC-UA will live up to its promise.

10/02/2007

Mission Control

Every process plant has a control room with numerous display devices. Some old plants still have large custom-built mimic panels, while newer plants have two main choices for display systems.

11/05/2007

Open Control Programming at Last?

Vendors were able to co-opt IEC61131, and some are wary of the same danger with respect to the new IEC61499.

11/07/2007

More Fiber in Your Network Diet

It is extremely difficult to eavesdrop on fiber-optic connections, guaranteeing a high degree of security.

12/10/2007

PACs for Communications and Data Handling

Process Control Tasks Performed by the PAC Include Closed-Loop PID Control of a Set of Heaters That Maintain the Sampling Ports at Constant Temperatures

01/04/2008

Calibrate This—Electronically

Moving From a Paper-Based System to an Automated One Can Bring a 15% to 25% Improvement in Efficiency

02/05/2008