Voices: Larson

Sonatrach Manages Risk with Lifecycle Services

Algerian Energy Company Adapts to the New, While Preserving Past Investments

By Keith Larson

HUGEMEA Banner

Operational risk can take many different forms. Continuing to rely on older, obsolete control systems presents one set of downsides. But moving forward to the new and unfamiliar can be risky as well. Sonatrach, the Algerian-based energy company, recently faced just such a dilemma, related Abderahmane Frih, Sonatrach control engineer, in a presentation to fellow process automation professionals from the Europe, Middle East and Africa (EMEA) region at the Honeywell User Group (HUG) meeting, November 4-7, in Nice, France.

At the company's natural gas liquefaction and processing facility on the North African country's western Mediterranean coast, several major pieces of equipment were due for overhaul, and presented an opportunity to overhaul its aging controls infrastructure as well. The plant's 1990s-era Honeywell TPS network had begun to show its age, and the operating system for its Windows XP consoles was scheduled to be unsupported by Microsoft come April, 2014.

Read Also: A Shared Stake in Customer Success

Sonatrach entertained the two paths forward: a full-scale migration to the Experion PKS, complete with new fault-tolerant Ethernet (FTE) network and C300 series controllers; or a more affordable network retrofit that effectively replaced the older Universal Control Network (UCN) with its FTE successor, Enhanced UCN (EUCN), together with new Experion PKS consoles.

From a hardware perspective, the latter approach involved swapping out controller and network interface cards such that all their Network Interface Modules (NIMs) became ENIMs, and their High Performance Managers (HPMs) became EHPMs. Importantly, this approach would allow Sonatrach to begin to leverage new network and HMI technology while preserving the company's investment in control programming and strategy development.

A full migration to Experion, on the other hand, would also have required re-engineering of the underlying code, a risk the company didn't care to take, Frih said. "The re-engineering of our control strategies would have been a more extensive effort entailing a longer shutdown, a longer FAT [factory acceptance test]," Frih said. "So we chose EUCN instead of the full C300 transition," he said.

To execute the transition, Sonatrach entered into a three-year-long Lifecycle Management (LCM) agreement with Honeywell that will also allow the plant some breathing room to plan for longer term evolution. "Cost and downtime were key considerations," Frih said. "This was the lower risk decision."

More from this voice

Title

Chinese Industry Reaping Fieldbus Benefits

Users, Engineering Firms Share Best Practices at Fieldbus Foundation General Assembly in Shanghai

04/22/2013

Slideshow: Images from the Fieldbus Foundation's 2013 General Assembly in Shanghai

Learn More About What Was Discussed in the Fieldbus Foundation's 2013 General Assembly in Shanghai. Here Is a Slideshow With Details

04/19/2013

Despite Uncertainties, U.S. Economy Poised for Stronger Growth

Federal Debt and Stimulus Withdrawal Are "Twin Elephants" in the Room

03/28/2013

Audit Helps Spanish Refinery Optimize System Performance

Integrated Automation Assessment Benchmarks System Performance Against Industry Best Practices

12/20/2012

Lifecycle Approach Streamlines System Updates for Repsol

Migrating Five Refineries Under One Master Agreement Yields Easier Project Management, Flexibility and Budget Predictability

12/17/2012

Carbon Capture Model Wins UniSim Student Competition

University of Edinburgh Student Awarded Top Prize

12/01/2012

SmartLine Transmitter Boasts Modularity, Ease-of-Use

Attention to Human Factors Helps Streamline Operator Tasks, Avoid Errors

11/30/2012

Q&A: Beyond the Process Variable

Tom Moser, president of Emerson Process Management's Rosemount Measurement unit, believes that instrumentation is a big part of the answer to the process industries' challenges to improve productivity, safety, efficiency and asset utilization. Control's Keith Larson talked with Moser at the 2012 Emerson Global Users Exchange in Anaheim, Calif., about the ongoing evolution of instrumentation capabilities as well as the application revolution enabled by wireless technology.

11/30/2012

Systems Update Balances New Capabilities, Lifecycle Support

Honeywell Users Treated to Past, Present and Future Technology Perspectives

11/29/2012

How to Deal with System Obsolescence

Process Industry Panelists Discuss Migration Challenges

11/28/2012

Honeywell Affirms Continuous Evolution Pledge

Lifecycle Services Commitment, New Enabling Technologies Showcased in Istanbul

11/27/2012

Cybersecurity Takes Cultural Commitment

Panelist Stress Need for Policies, Work Processes that Affirm Security

11/26/2012

Users Weigh Risks in Migration Decision

Are Your Automation Systems Starting to Work Against You?

11/06/2012

Desperately Seeking Cybersecurity

ICS-CERT Cyber-Ninja Offers Practical Insights to Industrial Control System Users

10/29/2012

Users Challenged by PLC Lifecycle

ExxonMobil Talks About the Industry's PLC Lifecycle Management Challenges

10/29/2012

Chevron's Journey to Automated Partial Stroke Testing

Operator Confidence and Control Are Key to Successful Implementation

10/28/2012

Performance, Harmonization on Triconex Roadmap

Plans Range from Triconex 'on the Control Network' to Real-Time SIL Visualization

10/27/2012

From Safety Systems to Operational Integrity

Invensys Seeks to Simplify Application, Eliminate Redundant Effort and Provide Integrated Context for Users of its Triconex Safety Systems

10/26/2012

Wireless Trialed to Reduce Overflow Risk

Chevron Demonstrates Use of Wireless Level Switches as an Independent Protection Layer

10/26/2012

Immersive Simulator Boosts Operator Preparedness

SimSci-Esscor Solutions Help Train Clean-coal Plant Operators

10/22/2012