Voices: Montague

Process Control Innovations: What Future Process Plants Can Be Like

The Long Greenfield: North West Redwater Partnership Is Building One of Very Few New Refineries in North America, and Its Using the Latest Process Control Innovations to Do It. Here's What Future Process Plants Can Be

By Jim Montague

If you want something done right, you have to do it yourself—but you'll likely keep more of the profit too.

That's the logic behind one of the most ambitious, long-term, greenfield oil and gas refinery projects in North America in recent decades. In an era when almost all large-scale refinery projects on the continent are brownfield renovations of existing plants and almost all new refinery construction seems to be in Asia or elsewhere, the North West Redwater Partnership in Calgary, Alberta, is working to build a brand-new refinery to process bitumen from operations in the province's Athabasca, Cold Lake and Peace River oil sands regions into diesel fuel and other products. As its name implies, NWR is a partnership between North West Upgrading Inc. and Canadian Natural Resources Ltd.

"The founders, including our process engineering vice president, started with a vision in 2003 to build a merchant upgrader that could take producers' bitumen and process it. Their plan was delayed awhile and modified to a fee-for-service model due to the recent recession, but now we're building it and a whole new company at the same time," says Gordon Ellwood, P. Eng., NWR's chief automation engineer, who joined in 2010 after 28 years at Shell Canada. So far, the young firm has about 500 employees and consulting staff.

Also read "The Future Horizon Plant"

Because bitumens from oil sands regions have traditionally been pipelined to the U.S. for processing, Alberta's government has long wanted to do some of that refining closer to home to increase jobs and gain some of the revenue that value-added products can provide. After a tender, the province granted NWR a bitumen royalty in kind (BRIK) contract in February 2011, which means the refinery won't have to buy feedstock because about 75% of its Phase 1 feedstock will be supplied by the Alberta Petroleum Marketing Commission. Next, the refinery will process it into high-value products, such as ultra-low-sulfur (ULS) diesel, diluent, naptha, vacuum gas oil (VGO) and other products, and market them on behalf of the feedstock owners. The ULS will meet low-carbon fuel standards, which means it can be sold in European markets that often have low-carbon and low-sulfur regulations.

"I believe we're the only partnership that Alberta has like this," adds Ellwood.

Processing on the Prairie

Located on 1,200 acres to allow for future expansion, NWR's new refinery is about 45 kilometers northeast of Edmonton and immediately west of Agrium's Redwater fertilizer operation in Sturgeon County (Figure 1). This location has many advantages, including close proximity to major crude oil and diluent pipelines leading to Midwest and West Coast markets, established local support infrastructures, and a stable and skilled regional workforce (Figure 2).

There are several opportunities for byproduct synergies with other industrial plants in Alberta. The land also is suitable as a foundation for future eco-industrial development based on essential feedstocks produced from upgrading and refining bitumen, and NWR expects its products will encourage development of downstream petrochemical applications and industries.

"Alberta's bitumen has to deal with market access issues," says Doug Bertsch, NWR's vice president of regulatory and stakeholder affairs. "And recent concerns about bitumen pipelines and rail transport is raising the value of our project and reinforcing that it's the right thing to do. Refining in Alberta increases the market potential of our bitumen. Alberta has a better-established, environmentally responsible and safer
infrastructure than many other places in the world, and diesel is a thinner, more concentrated fuel that can go by rail, truck or ship to local and export markets, and use less energy to get there."

Bertsch reports that NWR's refinery isn't just a new project, but it's also planned to be a long-term one as well. Regulatory approval is in place for three phases. Phase 1 is scheduled start operations in 2016 with an estimated capital cost of $8.5 billion. This first phase will process about 50,000 bbl/d (barrels per day) of bitumen and produce about 38,000 bbl/d of diesel, as well as other high-value, low-sulfur products. Pending owner sanction, two more 50,000-bbl/d bitumen phases will start up on-site in the early 2020s. Besides the novelty of being greenfield plants in North America, these refineries will also be configured differently than their older cousins.

"Most refineries use cokers for refining, but NWR is going to use gasifier technology, which takes the heavy ends from some of the bitumen and turns the heavy oil into hydrogen for use in the refinery and a high-purity stream of CO2 that will be captured and piped to central Alberta to help with enhanced oil recovery (EOR) operations," explains Ellwood.

Some Assembly, Suppliers Required

While site work began in March 2013, and other preparations have been underway for several years, some support structures at NWR only started going up earlier this year. These include the administration building, which was under construction in mid-February, and the reactor assembly building, which is already set to begin final assembly of large components that have been brought to the site in pieces (Figure 3). These include heavy, high-pressure reactor vessel segments, which can weigh as much as 500 tons (Figure 4).

Also read "How to Make a Sustainable Plant"

All of these huge reactors, pipelines and related equipment will be installed and configured as the primary process applications at NWR refinery's three phases, each of which will possess units for crude and vacuum, sulfur and light-ends recovery, hydro-processing, LC fining and gasification (Figure 5). To secure all the instruments, process controls and networking components required to monitor, operate, optimize and maintain its processes for Phase 1, Ellwood reports that NWR has formed cornerstone, supplier-of-choice agreements with Emerson Process Management for process and safety controls and with Yokogawa America for analyzer integration, including engineering services, sample systems and integration of all analyzers into cabinets and shelters.

"We're using DeltaV v.12.3 for our distributed control and safety instrumented system (SIS), approximately 20,000 hard I/O, CHARM electronic marshalling components, and Fisher Rosemount instruments, transmitters and valves, so Emerson is also our main automation contractor (MAC) for the refinery," says Ellwood. "Emerson is also supporting the five general engineering contractors on our crude unit, gasifier, utilities and finished product unit. So when a contractor lands a signal cable onto CHARM, then Emerson can do the engineering above. It's also responsible for supplying the remote equipment buildings in three standard sizes and their marshalling and control cabinets." NWR also plans to run a third DeltaV DCS for operator training, and perhaps a fourth to help develop new control strategies.

Related field instruments are using the HART v.7.3 communications protocol, while most subsystems rely on Modbus TCP/IP and Modbus RTUs. Reportedly to keep its network as simple as possible, Ellwood adds that NWR is not using Foundation fieldbus and is instead running point-to-point, 4-20 mA wires to reach its field devices. The refinery may also consider using some wireless monitoring devices in the future.

"Point-to-point doesn't reduce wires in the field, of course, but we don't have to put in bus controllers or do complex, macro-cycle calculations, and this eliminates a lot of engineering time," says Ellwood. "We believe this is a simpler, more reliable design, and especially after HART 7 was released in 2010. We can now get all the diagnostics we need over 4-20 mA without having to use complex fieldbus devices."

Meanwhile, NWR's second main  automation supplier, Yokogawa, is integrating about 180 process analyzers from multiple suppliers. These include chromatographs, wet chemistry, titration and other instruments to analyze CO2, O2, conductivity, pH, finished products and other process variables.

"Yokogawa is also designing and fabricating the analyzer shelters, which  include the sample systems," explains Ellwood. "Consequently, because this is a new analyzer concept, Yokogawa also has to act like a system integrator. As a result, it's coordinating analyzer shelter construction and will supply site services."

Peopling the Plant

Besides erecting buildings and implementing physical equipment, new refineries or other process plants require a veritable army of operators, technicians, engineers and support staff—even if their overall numbers may have decreased due to technological advances in recent years.

Ellwood reports that NWR handpicked eight core individuals to serve on its automation team, including seven resident unit engineers, who have been working in the contractors' shops reviewing and approving each new design and plan. The last team member was a single process analyzer specialist with responsibilities across all units.

Next, NWR hired a MAC project manager to coordinate tasks with Emerson. Similarly, Ellwood reports his job has been to help NWR maintain technical responsibilities, consistency and project direction.

In addition, to manage all its various instruments and other components, NWR is enlisting a consultant from Wisetools Inc to be its its SmartPlant Instrumentation (SPI) administrator and is also adopting Intergraph's SmartPlant (SP) Foundation software, which includes its SP3D, SP P&ID, and SP Electrical and SP Instrumentation software packages.

Write Play, Assign Parts

To get all its people, devices and other ducks in a row, Ellwood adds that NWR's designers, engineers and partners spent the first half of 2011 defining roles, responsibilities and accountabilities for all staff and contractors at the refinery. More recently, the core team finished 18 months of front-end designs, which resulted in about 200 engineering documents and drawings covering its automation standards and scope, such as a draft of the best philosophy for its P&IDs.

To further define and specify the actions, deliverables and documents for specific controls and interfaces, the team also developed NWR subject matter expert (SME) technical focal point roles across the project, as well as roles and responsibilities documents that define interfaces with engineering contractors, SOCs and consultants. Likewise, NWR has committed to Emerson's Process Management Organization (PMO) Configuration Standards for Delta V (PCSD), which is a suite of software configuration templates and reference standards that DeltaV users can implement and then customize to fit the needs of their applications.

"We'll say we want to use the PCSD templates without changing them, but it's harder when we try to implement them because there are many subjective changes that come up," explains Ellwood. "We can also take templates from Emerson's library of software building blocks. We're using about 200 of these templates, which contain function blocks or combinations, and using them to create many of our process controls, safety functions, HMI faceplates, graphics and alarms. I believe we're going to end up with about 300,000 total functions blocks in about 200 unique configurations, combinations or interface templates."

Next, NWR's team will complete more detailed designs and data sheets during the coming 18 to 24 months. "This is all pretty exciting because the last new refinery in Canada was built by Shell in 1983," says Ellwood. "Being able to do the front-end engineering on a greenfield plant with the latest technologies is allowing us to save on physical designs, take up smaller footprints and use less cabinet space, and employ simpler architectures. All of this will reduce spending and operating costs."

The Human Factor

Because NWR is building a new refinery, it's able to address relatively recent issues like operator awareness and effectiveness with a clean slate and put in the best available solution from the beginning without having to renovate or cope with earlier, less functional solutions.

As a result, NWR recently sought assistance from Dave Strobhar, chief human factors engineer (HFE) at the Center for Operator Performance, during its initial, front-end engineering efforts. "Dave is consulting with us on applying HFE principles to how we're laying out our graphics and how we're rationalizing our alarms," adds Ellwood. "This input becomes really invaluable when we sit down with our operators and talk about the hierarchy of graphics and levels in which they should appear. We've already adapted some of our key DCS graphics standards and integrated more HFE in our alarm philosophy." For example, Jason Gray and NWR's other operations DCS coordinators recently started with an overview of its planned Level 1 control layout and added control of critical points with carefully demarked functional groupings and minimal colors to create a prototype HMI screen that can be used at the new refinery once final elements are added and approved (Figure 6).

Bertsch adds, "It's not just about producing high-value fuel with a lower carbon footprint. Our gasifier will enable NWR to capture two-thirds of the CO2 we generate and sequester it, while helping others improve conventional oil recovery. CO2 used to be thought of as a waste stream, but we've transformed it into another valuable product stream. That's why NWR is the first refinery designed from the ground up with carbon-capture capabilities and low-carbon fuel production."

More from this voice

Title

Rockwell Automation Showcases Oil & Gas Capabilities

Oil and Gas Booth Sets Visitors on Process Control Pathways

11/14/2013

Safety Stories - So What?

Maybe Everyone is Doing a Great Job, and This Seemingly Unending Series of Accidents Is Just Statistics Catching Up With Us

09/10/2012

Sample Conditioning Systems Need Love Too

Process Users and Integrators Must Carefully Design and Match SCSs With Application Requirements and Specifications, Complete Application Data Sheets and Deploy Climate-Controlled Shelters

12/07/2011

Santos Integrates Intelligent Field with Transformative Operations Center

Automation Professionals Needed a More Efficient Way to Run Their Plants, Monitor and Control the Fields, and Integrate Operations. Santos Ltd. Delivered!

10/02/2013

SCADA Update Protects Potable Production

Windsor Utilities Commission Bolsters Its Water Production System With Data Tracking-and-Tracing Capabilities and Some Wireless Controls

09/07/2012

Search for the Asset Management, Part II

GlaxoSmithKline, Beamex and Emerson Process Management team up to streamline calibration and asset software - and use far less paper-at GSK's plant in Cork, Ireland.

03/06/2012

Securing Your Sustainability

Here Are Some Basic Ways to Go Green That Can Be Used Across Different Processes

06/06/2012

Security Standards Stewpot Simmering

Process Controls Engineers, IT Technicians, Manufacturers and End Users Have Been Left Hungry as Government Departments, Trade Organizations and Corporations Struggle to Develop and Coordinate Basic Standards for Securing Industrial Networks and Software

10/28/2008

Seeds with teeth!

Senior Tech Editor Jim Montague muses that maybe it's time to think up some new incentive programs for individuals and teams to make more and better innovations in process control applications.

01/05/2007

Seeing deeply into process control technologies

Executive Editor Jim Montague finds that even if there’s nothing new under the sun, what’s truly new may be a deeper understanding and appreciation of what we thought was so familiar.

08/07/2006

Seeking ISASecure Certification

ISA Has Developed ISASecure Certification Program

10/15/2013

Serious Sustainability

There's a Lot More to Truly Going Green Than Efficiency. Here's How Some Experienced End Users and Their Applications Are Mastering Process Sustainability

06/06/2011

Shared Documents Aid Valve Repairs

Using New File-Sharing and Procedural Tools in Complex Projects Can Save You Time and Headaches

01/10/2012

Shared Pains in the Neck

Most Professions and Industries Are Facing the Same Brain Drains, Struggles With IT, Going Green Questions and How to Use Social Media

08/15/2011

Shell Deepwater Taming Big Data Whale

Exception-based Surveillance Helps Manage Hundreds of Millions of Daily Data Points

06/19/2013

Shell's Long-Time Push for Fieldbus

What's Next? Making Foundation Fieldbus Systems More Mature. Meaning, Making Them More Broadly Applicable in Projects

11/18/2009

Shifting to a Safety Mindset

Profit Isn't Helped by Meeting Production Targets by Sacrificing People and Equipment Integrity. Accidents Really Are More Costly Than Safety

06/29/2009

Short on Specifics

Control Strives to Give Readers Specific Content They Can Use to Make Their Processes and Applications More Efficient and Make Their Stressful Jobs a Little Less So

02/06/2009

Simplicity = Freedom

Reducing Wiring Doesn't Just Save Labor, Time and Expenses

12/07/2011

Simulation Speeds Up

As They Get Closer to Real Time, Simulations Are Taking on Many More Varied Applications and Helping to Optimize Them

10/18/2013