There goes Al.

Like many sites, we’re watching many years of knowledge and experience walk out the door. But Al was one of those board operators who made our instrument maintenance jobs more interesting. When he was on the DCS console, he’d have some obscure measurement he wanted us to check — points no one else seemed to care about. So our instrument tech might get a little cranky when Al was on day shift, and he had to climb around to verify or validate a reading that concerned only Al. Why did he worry about these measurements to which no one else paid much attention?

As measurement and control specialists, we might neglect to ask our "end user” why a particular measurement is useful or important. Did Al share his insights with any of his peers? And what happens when his much younger successor asks the old tech to climb a tower to verify a reading? Will he or she get the same respect, service and cooperation when they ask us to fix the funky troublesome measurement everyone else seems to tolerate or ignore?

For example, why don’t the two measurements on an intermediate storage tank agree? Our storage tanks have been fitted with redundant level transmitters in an effort to comply with overfill/spill protection concerns and process hazard analysis (PHA) recommendations. While secondary containment exists in the form of tank dikes and a closed sewer system, the consequences of a single erroneous measurement causing an incident justifies two transmitters on every tank. If you’re like us, you’re measuring the level with a couple differential pressure transmitters that have a quoted accuracy of some fraction of a percent. Why not expect the levels to agree consistently to the same tolerance? But so what if they’re off a few percent, so long as one or the other keeps us from exceeding the high-high level, or ensures the floating roof doesn’t rest on its stands when the level is low?

Many levels are among the most ubiquitous and perhaps some of the most uncertain measurements we make as I&C professionals. Many are expressed in percent, and the less jaded observer would justly ask us, "percent of what?” Sometimes we go to some pains to make the measured percent match a level gauge. Sometimes there isn’t a gauge glass or other independent indication of level. Our DP transmitter or radar/sonar/nuclear device is the only insight anyone has before some undesirable consequence ensues. If we’re not converting level to inventory (volume) for custody transfer, it can be one of the easiest measurements to write off as a "trend.”

The process plant workers who are headed for the golf course have been agents in the culture that determines what’s been tolerable or acceptable. Maybe your site has an "Al” whose sensibilities motivate him or her to be a gadfly for measurement certainty and validation. But too often, we’ve settled into a mutual comfort zone where smooth sailing through the shift is given priority over questions and forensics that might rock the boat. Will the same levels of compromise be passed on to our successors?

As providers of measurement and control, our customer focus is not just the investor who’s financing a project or the project manager beating the drum to meet cost and schedule. Whether you’re an engineer specifying a precision measuring device, a systems person devising HMI and control strategy or anyone in our discipline’s entire supply chain, your ultimate customer is Al and his crew mates. The CFO may be writing the checks, but plant managers lose sleep worrying about where their crews might take the plant. Shouldn’t our focus be to deliver the most truthful, precise and robust depiction of an otherwise inscrutable process?

If you’re still specifying and installing analog 4-20 mA control systems in the 21st century, do you think "future Al” will notice or care? Having interviewed and trained members of Gen X and Millennials to take the helm of highly hazardous processes, I’d say, "You bet!”

More from this voice

Title

Trunk Testing Tribulation

It's Challenging to Power Down Segments While the Plant is Down, Let Alone While a Process Is Up. Powering Down Is Not an Attractive Option

12/04/2012

When to Use Control in the Field

Exploiting Control in the Field Is Never an All-or-Nothing Proposition

11/02/2012

One Remarkable Transmitter

Two Decades Ago Engineers Saw No Value in Smart Transmitters, but Today They Have All Finally Accepted the Fully Digital Transmitter and Its Value

10/03/2012

How Can Incompatible DCS and Asset Management Suppliers Get Along?

One Throat to Choke: When a Site Has an Installed Base of Incompatible DCS and Asset Management Suppliers, It May Have to Revert to the Host's Offerings

09/04/2012

Easier Commissioning with Wireless

With a Capable System, the End User Is Mouse-Clicks Away From Knowing 99% of What He Needs to Know About the Device Without Ever Lifting a Wire

07/30/2012

Digital Integration Commissioning: Take It Easy!

To Fully Exploit the Capabilities of Digitally Integrated Field Devices, Field People Need to Touch the DCS. Let the Plebs Touch the DCS!

07/05/2012

Smart Pipe--One Bus to Rule Them All

What Revolutionary Technology Is Coming Along That Will Kill Fieldbus?

06/05/2012

Selling Diagnostics to Management, Part 2

Dear Plant Manager, We See a Chance to Get Distinctive and Strategic Value From Intelligent Devices; Give Us a Chance to Prove We Can Do It

05/07/2012

Selling Diagnostics to Management

Managers Are Paid the Big Bucks to Make Decisions That Many Times Boil Down to "How Much Insurance Do I Want to Buy?

04/05/2012

Using Your Best People

Getting to Know Those Working Around You. How Did They Become an "Instrument" Person?

03/02/2012

Is Lick-'n-Stick Wireless the Future?

Wireless Networks Don't Come Cheap Nor Does Running Lengthy Wiring That Is Also Time Consumming. Are You Waiting on Standards Convergence or on the Right Application?

02/06/2012

Want Open Standards? Work at It

End Users Have to Insist Their Favorite Suppliers Support Open, Interoperable Solutions, or We'll Remain Saddled With the Closed, Proprietary Ones

12/30/2011

Operations Drives Reliability

Operators Can Have a Bigger Impact on Asset Reliability Than Our Maintenance Department

12/05/2011

Choosing a Fieldbus Host

Selecting a Fieldbus Host Is Not an Easy Decision. It Might Be as Life-Changing as Getting Married

11/02/2011

Are Users Happy with ESD Solutions?

Seems to Be That Users Are Quite Happy With Separate Emergency Shutdown (ESD) Packages

10/03/2011

Which Bus--If Any--for On-Off Valves?

Profibus PA and Foundation Fieldbus Give the End User Flexibility to Integrate On-Off Valves Wherever the Process Places Them

08/31/2011

Easy Oscilloscopes for All Buses

Troubleshooting Fieldbus Is Rarely Straightforward. One Might Need to Disconnect Segments and Shoot Them With Oscilloscopes and Meters

08/02/2011

Death of the Loop Drawing

Loop Drawings Have Become Mere "Wiring" Diagrams. Are They Needed for Fieldbus Projects?

07/05/2011

Siemens–Not Just for Profibus Anymore

In PCS 7 We May Have the First SIL-Capable Logic Solver With Native Support for Foundation Fieldbus

06/06/2011

Automation Business: India on the Move

India Graduates Up to Four Times More Engineers Than Lawyers, and at a Pace Double the Rate in the United States

04/28/2011