Voices: Rezabek

Forays into Fieldbus Technology Pay Off

Plenty of Training Resources Available to Get Team On Board

By John Rezabek

Back around the time smart transmitters were becoming mainstream — 1989 — Keystone beer introduced an ad campaign touting its, well, relative lack of flavor. The beer delivered refreshment guaranteed to minimally challenge one's palate. In the ad, a quaff of “bitter” beer sent its subject into facial contortions, revolting to all who witnessed them. Better flee to an insipid, corn-adjunct-diluted brew.

There are those who've taken a sip of fieldbus technology, experienced an episode of “bitter beer face,” and remain unwilling to go near it since. Unforeseen struggles with a supplier, service provider or technology can be enough to quash any inclination to get another six-pack.

But what if you want to escape the bland world of 4-20 mA? If you have a thirst for an all-digital, 21st-century process control infrastructure, you'll encounter many who consider forays into new technology—for example, digitally integrated field devices using an open standard—a gamble with too much chance of potentially bitter consequences. How do you convince these folks to try a sip of your proposed brew?

Training: Training junkets aren't just about learning technology. They're also for learning about each other, and gaining an appreciation of your end users' fears and challenges. If it's a class with attendees from other locations, you both have a great opportunity to learn things from them and share war stories. It can be a great comfort for your plant's guys and gals to see they're not the first pioneers on the prairie, and often you—and they—will learn as much or more from your peers as you do from the course material. Sessions should not be restricted only to specialized training focused on fieldbus. They should include training from systems suppliers (once they're chosen), asset management system providers and possibly device suppliers as well.

Device Replacement: Device replacement has been distasteful for a lot of end users, especially when they need to call an engineer when a device or fieldbus segment needs downloading. In Foundation fieldbus (FF), by design, devices come out of the box as blank slates with minimal configuration. The idea is that a centrally stored database in the DCS is a more desirable repository to preserve a consistent device configuration. But complications arise when instrument technicians are neither trained nor permitted to perform any operations on the DCS. Other complications ensue if the device checked out of the storehouse is a later revision than the one originally installed. If they don't match, the system configuration requires sediting, and sometimes new device descriptors (DDs) have to be downloaded. This is particularly onerous for remote sites with dicey Internet access. Bitter beer face!

The Fieldbus Foundation is addressing this issue today, beginning with a specification called compatibility_rev. Devices and host systems employing this parameter will allow a new device to be commissioned as an earlier revision—all the way back to the revision specified by compatibility_rev. It works like this: If your project installs Revision 3 of a transmitter, when the storehouse restocks with the latest revision, this new device can still be commissioned as Revision 3 without installing a new DD or changing the system configuration. A number of systems and device suppliers have begun creating tools and wizards that exploit this feature. It's been an optional feature since ITK5 devices, but consideration is being given to making it mandatory before the next major update.

When taking your first sip of fieldbus “beer,” you don't need to brace yourself for a bitter experience. There are plenty of training resources to get your team on board, and the Fieldbus Foundation's focus on H1 usability aims to make FF as simple as old 4-20 mA. Once you've trained your palate, you'll wonder how you ever put up with the bland brews of yesteryear.

More from this voice

Title

One Remarkable Transmitter

Two Decades Ago Engineers Saw No Value in Smart Transmitters, but Today They Have All Finally Accepted the Fully Digital Transmitter and Its Value

10/03/2012

How Can Incompatible DCS and Asset Management Suppliers Get Along?

One Throat to Choke: When a Site Has an Installed Base of Incompatible DCS and Asset Management Suppliers, It May Have to Revert to the Host's Offerings

09/04/2012

Easier Commissioning with Wireless

With a Capable System, the End User Is Mouse-Clicks Away From Knowing 99% of What He Needs to Know About the Device Without Ever Lifting a Wire

07/30/2012

Digital Integration Commissioning: Take It Easy!

To Fully Exploit the Capabilities of Digitally Integrated Field Devices, Field People Need to Touch the DCS. Let the Plebs Touch the DCS!

07/05/2012

Smart Pipe--One Bus to Rule Them All

What Revolutionary Technology Is Coming Along That Will Kill Fieldbus?

06/05/2012

Selling Diagnostics to Management, Part 2

Dear Plant Manager, We See a Chance to Get Distinctive and Strategic Value From Intelligent Devices; Give Us a Chance to Prove We Can Do It

05/07/2012

Selling Diagnostics to Management

Managers Are Paid the Big Bucks to Make Decisions That Many Times Boil Down to "How Much Insurance Do I Want to Buy?

04/05/2012

Using Your Best People

Getting to Know Those Working Around You. How Did They Become an "Instrument" Person?

03/02/2012

Is Lick-'n-Stick Wireless the Future?

Wireless Networks Don't Come Cheap Nor Does Running Lengthy Wiring That Is Also Time Consumming. Are You Waiting on Standards Convergence or on the Right Application?

02/06/2012

Want Open Standards? Work at It

End Users Have to Insist Their Favorite Suppliers Support Open, Interoperable Solutions, or We'll Remain Saddled With the Closed, Proprietary Ones

12/30/2011

Operations Drives Reliability

Operators Can Have a Bigger Impact on Asset Reliability Than Our Maintenance Department

12/05/2011

Choosing a Fieldbus Host

Selecting a Fieldbus Host Is Not an Easy Decision. It Might Be as Life-Changing as Getting Married

11/02/2011

Are Users Happy with ESD Solutions?

Seems to Be That Users Are Quite Happy With Separate Emergency Shutdown (ESD) Packages

10/03/2011

Which Bus--If Any--for On-Off Valves?

Profibus PA and Foundation Fieldbus Give the End User Flexibility to Integrate On-Off Valves Wherever the Process Places Them

08/31/2011

Easy Oscilloscopes for All Buses

Troubleshooting Fieldbus Is Rarely Straightforward. One Might Need to Disconnect Segments and Shoot Them With Oscilloscopes and Meters

08/02/2011

Death of the Loop Drawing

Loop Drawings Have Become Mere "Wiring" Diagrams. Are They Needed for Fieldbus Projects?

07/05/2011

Siemens–Not Just for Profibus Anymore

In PCS 7 We May Have the First SIL-Capable Logic Solver With Native Support for Foundation Fieldbus

06/06/2011

Automation Business: India on the Move

India Graduates Up to Four Times More Engineers Than Lawyers, and at a Pace Double the Rate in the United States

04/28/2011

Attack of the Mutant Chicken Foot!

Consider a Simple "Chicken Foot" or "Star" Topology for Your First Fieldbus Job

04/04/2011

Fieldbus: Lion or Lamb?

Ways Fieldbus End Users Can Avoid Increasing Stress for Their EPC Consulting Firm

03/09/2011