Modular & Concurrent Design Using Standardized Interfaces for Accelerating Design Process

Overview:

The successful execution of an accelerated project from Concept to Process Qualification within 1 year with extensive usage of multiple Vendors requires a paradigm change for the Batch and Automation part of the project. Traditionally one Automation supplier has delivered and configured the complete Batch & Control system and a number of Skid Vendors has supplied only equipment,machinery & piping. To accelerate the project execution to meet the 1 year goal requires a Modular approach, where the Design, Implementation, Construction and Validation are done concurrently and where the Validation is planned from day one and included in the design. Skid Vendors must take responsibility of the Batch & Control system as well as the mechanical part and deliver a complete package that is validated to the extend possible before installation on-site. The different Skid Vendors may use different Batch and Control system products, and thus demand a very high level of standardization, especially regarding structuring (S88) and interfacing (OPC, S95 etc.). The Batch and Control system products on the market today do enable this high level of standardization, but when it comes to things like Material tracking and local inventory, there is still a need to have oneMaster system managing this. Initiatives like BatchML & B2MML published by WBF for the S88 & S95 standards will ease the integration, but the Systems available today still have too much formatting information that needs to be included to really make the integration easy.

The successful execution of an accelerated project from Concept to Process Qualification within 1 year with extensive usage of multiple Vendors requires a paradigm change for the Batch and Automation part of the project. Traditionally one Automation supplier has delivered and configured the complete Batch & Control system and a number of Skid Vendors has supplied only equipment,machinery & piping. To accelerate the project execution to meet the 1 year goal requires a Modular approach, where the Design, Implementation, Construction and Validation are done concurrently and where the Validation is planned from day one and included in the design. Skid Vendors must take responsibility of the Batch & Control system as well as the mechanical part and deliver a complete package that is validated to the extend possible before installation on-site. The different Skid Vendors may use different Batch and Control system products, and thus demand a very high level of standardization, especially regarding structuring (S88) and interfacing (OPC, S95 etc.). The Batch and Control system products on the market today do enable this high level of standardization, but when it comes to things like Material tracking and local inventory, there is still a need to have oneMaster system managing this. Initiatives like BatchML & B2MML published by WBF for the S88 & S95 standards will ease the integration, but the Systems available today still have too much formatting information that needs to be included to really make the integration easy.

Author: Frede Vinther, Specialist in Automation, Novo Nordisk Engineering  | File Type: PDF

Find more white papers on Software & Integration

View all white papers»