Title
|
Author
|
Date
|
| Batch Manufacturing in the Biopharmaceutical Environment |
Torsten Winkler, WBF |
06/23/2008 |
| |
| Batch Control Analysis |
Ferenc Molnár, Tibor Chován, Tibor Nagy, WBF |
06/23/2008 |
| |
| ISA 95 Integration Between SAP R/3 And Batch In Pharmaceutical Applications |
Stephan Van Dijck, WBF |
06/23/2008 |
| |
| Model Predictive Control of Batch Temperature |
Bill Gough, Sava Kovac, Lynne DeVito, David Quick, WBF |
06/23/2008 |
| |
| Multiple Products in a Monoclonal Antibody S88.01 Batch Plant |
Mahasti Kheradmand, John O’Connell, WBF |
06/23/2008 |
| |
| Monitoring Multi-Recipe Batch Manufacturing Performance |
Julian Morris, Elaine Martin, WBF |
06/23/2008 |
| |
| How to Establish a Batch Best Practice |
Paulo Ignacio Fonseca de Almeida, WBF |
06/23/2008 |
| |
| Real Time Batch Control and Materials Management in Perfume Production |
Mike Hunter, WBF |
06/23/2008 |
| |
| Batch Modeling in Pharma Industry: The Role of the Engineering Company |
Valerio Sala |
06/23/2008 |
| |
| Targeting Batch Outcome using Predictive Control |
Dr. Eyal Brill, Mr. Oren Yulevitch, WBF |
06/23/2008 |
| |
| Automated Batch Scheduling and MES Integration Using a Hierarchical Based, Batch Control Software Architecture |
Nathan Pettus, Dieter Wolf, WBF |
06/23/2008 |
| |
| Predictive Material Delivery to A Batch System |
David A. Chappell, Section Manager, Procter & Gamble |
08/24/2008 |
| |
| Predictive Control of Batch Reactors |
J. Richalet, ADERSA; Eric Vitté, Schneider Electric |
08/24/2008 |
| |
| Project Management of Batch Control Projects: How to avoid the Pitfalls |
Dr. Maurice J. Wilkins, Director of Process Automation and Control Systems, ... |
08/24/2008 |
| |
| General Recipe: Multiproduct Facility Design; Technology Transfer |
Marin Klaric, Business Development Specialist, PLIVA |
08/24/2008 |
| |
| WBF XML Schemas |
David Emerson, Senior Systems Architect, Yokogawa |
08/25/2008 |
| |
| Advanced Control of Batch Reactor Temperature |
Mihai Huzmezan, University of British Columbia, Pulp and Paper Centre; Bill ... |
08/25/2008 |
| |
| Exception Handling – A Practical and Manageable Approach |
Alistair Ross, Alba Controls Limited |
08/26/2008 |
| |
| C&O Methodology: Delivering Batch Plant Project Right First Time |
Dr Phillip Cheng, Lead Consultant, Eutech |
08/26/2008 |
| |
| A DuPont Batch Automation Project Experience |
John W. W. Wood Jr, Technical Engineer, DuPont; Vernon F. Morenas, R&D ... |
08/26/2008 |
| |