I wanted to provide my observations on Friday July 2’s NERC CIP Standards Drafting Team conference call. The call was critical, as the drafting team was to vote on a priority request from NERC to define the direction the CIP standards will take for the rest of the year to meet FERC and Congressional requests. The existing CIP-002 approach allows utilities to exclude assets at their discretion. On the call it was mentioned there are nuclear plants that are not considered NERC critical assets as well as high voltage transmission assets that are also not considered NERC critical assets.