Online Resources: Process Analyzer System Safety and Ergonomics II
October 2007 Article
Process Analyzer System Safety and Ergonomics II
Additional resources:
The article, "Process Analyzer System Safety and Ergonomics II," is the seventh in series running in Control over the past several months. Here are links to all of them in the order of their appearance.
- Nichols, Gary D., PE, āHow to launch a lifecycle reliability program,ā Control, June, 2006, p. 49
- Nichols, Gary D., PE, āAccurately Scoping Process Analyzer Projects,ā Control, October 2006, pg. 69
- Nichols, Gary D., PE, āProject Roadmaps Get You There,ā Control, December 2006, pg. 47
- Nichols, Gary D., PE, āCost Estimating for Process Analyzer Projects and Reliability,ā Control, March 2007, pg. 59
- Nichols, Gary D., PE, āMore about Estimating Process Analyzer Projects,ā Control, April, 2007, pg. 63Ā
- Nichols, Gary D., PE, āProcess Analyzer System Safety and Ergonomics, Part I,ā Control, August, 2007, Web Exclusive article.
Bibliography
- Gruhn, Paul, PE. and Harry L. Cheddie, P.E., Safety Shutdown Systems: Design, Analysis and Justification, ISA, Research Triangle Park, NC, USA, 1998.
- Nichols, Gary D. PE. āProcess Analyzer System Safety and Ergonomics Iā, Control, web exclusive, August 2007.
- Nichols, Gary D., PE. āCost Estimating for Process Analyzer Projects and Reliability IIā, Control magazine, April, 2007, pg. 63.Ā Ā
- Nichols, Gary D., PE. āCost Estimating for Process Analyzer Projects and Reliability Iā, Control, March 2007, pg. 59.
- Nichols, Gary D., .E, āAccurately Scoping Process Analyzer Projectsā, Control October 2006, pg. 69.
- U.S. Department of Labor, Occupational Safety and Health Administration, Code of Federal Regulations, 29 CFR 1910.
