Nancy Bartels is Control's managing editor. You can her at [email protected] or check out her Google+ profile.Hierarchy is important. Your operators need to move from a general overview down to detailed information in a logical manner.
Level 1 is a process area overview that covers the operator's entire span of control. Operators should be able to tell at a glance the overall operational condition of the process for which they are responsible.
Level 2 screens show the sub-unit for which the operator is responsible. There should be a Level 2 screen for each major unit operation, such as a compressor, a reactor, a furnace, etc. These screens should show all the information and controls necessary to perform operator tasks for that unit.
Level 3 screens show all the detail about a single piece of equipment or process control scheme. These screens are used for diagnostic purposes.
Level 4 shows details of subsystems, sensors or components and/or miscellaneous information.
The tiny EZminiWiFi is a godsend for the plant maintenance engineers who need to make a minor modification to the HMI program or, for that matter, the PLC program. It's very easy...
Discover the benefits of American-made automation products, including stable pricing, faster delivery, and innovative features tailored to real-world applications. With superior...
Over the past 50 years, the automation technology landscape has changed dramatically, but many of the underlying industry needs remain unchanged. To learn more about what’s changed...
Watch EZAutomation's recent feature on the popular FOX Network series "Manufacturing Marvels" and discover what makes them a force to be reckoned with in industrial automation...