Under the Hood with MPC

Oct. 31, 2012
MPC Is Not Designed for Abnormal Situations. Process Knowledge Is Still Mandatory for Operators
About the Author
Dan Hebert is senior technical editor for Control, Control Design and Industrial Networking. Email him at [email protected]. See his Google+ profile.Systems integrator Mick Automation has been involved in MPC and APC since the 1990s, implementing control systems for clients around the world.  "We use APC to push the process against its multiple constraints simultaneously and continuously," says Richard McCormick. "This provides huge benefits for clients, especially when their process throughput is limited. It also reduces variability so a process can be pushed further toward its limits."

Real process models provide predictive behavior, but also very important process information that sometimes surprises operators and process engineers. "Models allow us to more easily target process physical limitations when MPC continually hits the same constraints," he says. "This can help a lot in economic justifications for process upgrades by quantifying percent of time against a constraint. Examples can be fan/heat exchanger cooling capacity or limited pumps and hydraulics."

MPC removes the operator "safety cushion" that some control systems put in to avoid excursions because of their variability. "It minimizes perfectly normal human limitations such as a long shift, lack of experience or too many units to control at the same time," he explains. "The safety cushion varies depending on operator knowledge/experience, and it keeps the process away from its real constraints."

"Skill degradation for operators is another issue," he adds. "They easily and quickly lose the feeling of how much they should move manipulated variables once MPC is out of service.  Model-based, high-fidelity operator training simulators are the best solution, but they are still too expensive for most users and hard to maintain. MPC is not designed at all for abnormal situations, meaning process knowledge is still mandatory for operators."

McCormick likes real-time dynamic optimization sitting on top of MPC applications. "There are differences between rigorous steady-state optimization versus dynamic optimization," he says.   "The first one requires developing chemical engineering equations for the whole process to be optimized, but it can only run under steady-state conditions. With dynamic optimization, such as Honeywell's Profit Optimizer that sits on top of Profit Controllers, you can attach off-line process simulators for nonlinear processes and make it run at certain frequencies to automatically update optimizer parameters on the fly."

Sponsored Recommendations

2024 Industry Trends | Oil & Gas

We sit down with our Industry Marketing Manager, Mark Thomas to find out what is trending in Oil & Gas in 2024. Not only that, but we discuss how Endress+Hau...

Level Measurement in Water and Waste Water Lift Stations

Condensation, build up, obstructions and silt can cause difficulties in making reliable level measurements in lift station wet wells. New trends in low cost radar units solve ...

Temperature Transmitters | The Perfect Fit for Your Measuring Point

Our video introduces you to the three most important selection criteria to help you choose the right temperature transmitter for your application. We also ta...

2024 Industry Trends | Gas & LNG

We sit down with our Industry Marketing Manager, Cesar Martinez, to find out what is trending in Gas & LNG in 2024. Not only that, but we discuss how Endress...