A peaking plant may see little use until it is REALLY needed, and at that point it must run in a prescribed period of time. Depending on whether the peaker is on Automatic Generator Control (AGC) or other form of dispatch, it will be required to be available within 10-30 minutes. This stringent timing requirement will often result in some form of remote vendor and/or corporate engineering access to ensure the unit(s) can meet the dispatch requirements. If the plant is unmanned, which happens often with peaking units, automated remote access is the only option for dispatch.

A peaking plant may see little use until it is REALLY needed, and at that point it must run in a prescribed period of time. Depending on whether the peaker is on Automatic Generator Control (AGC) or other form of dispatch, it will be required to be available within 10-30 minutes. This stringent timing requirement will often result in some form of remote vendor and/or corporate engineering access to ensure the unit(s) can meet the dispatch requirements. If the plant is unmanned, which happens often with peaking units, automated remote access is the only option for dispatch. By definition, an automated dispatch request to a control system that results in the unavailability of a peaker unit(s) is a control system cyber incident.

A peaking plant in almost all cases will not fall under the NERC CIP bright line of 1500 MW. Consequently, it will likely have minimal cyber mitigation technology and minimal cyber training for on-site or remote staff. Unlike a large unit falling under the NERC CIP criteria, the peaker is wholly judged (and potentially fined) by its impact on grid reliability even though the dispatch problem was a control system cyber incident. The other impact beyond the immediate loss of revenue or fine is even bigger- the potential loss of the unit being considered for dispatch which can result in the long-term shutdown of the unit.

Isn't it ironic that the NERC CIPs can lead to reduced grid reliability and the economic shutdown of utility assets?

Joe Weiss

Sponsored Recommendations

2024 Industry Trends | Oil & Gas

We sit down with our Industry Marketing Manager, Mark Thomas to find out what is trending in Oil & Gas in 2024. Not only that, but we discuss how Endress+Hau...

Level Measurement in Water and Waste Water Lift Stations

Condensation, build up, obstructions and silt can cause difficulties in making reliable level measurements in lift station wet wells. New trends in low cost radar units solve ...

Temperature Transmitters | The Perfect Fit for Your Measuring Point

Our video introduces you to the three most important selection criteria to help you choose the right temperature transmitter for your application. We also ta...

2024 Industry Trends | Gas & LNG

We sit down with our Industry Marketing Manager, Cesar Martinez, to find out what is trending in Gas & LNG in 2024. Not only that, but we discuss how Endress...