What hath the NERC CIPs wrought?
A peaking plant may see little use until it is REALLY needed, and at that point it must run in a prescribed period of time. Depending on whether the peaker is on Automatic Generator Control (AGC) or other form of dispatch, it will be required to be available within 10-30 minutes. This stringent timing requirement will often result in some form of remote vendor and/or corporate engineering access to ensure the unit(s) can meet the dispatch requirements. If the plant is unmanned, which happens often with peaking units, automated remote access is the only option for dispatch.