Exchange the Exchanger?

July 10, 2004
Problem Solving Ideas: A Reader's Welded Plate Heat Exchanger has Failed Three Times in Six Years--Should They go to a Shell and Tube?

We have a batch ethoxylation / propoxylation process. Temperatures range from 85° F during changeover to 350° F during reaction periods. Pressure ranges from full vacuum to 100 psig. Currently we use a welded plate and frame heat exchanger with a diathermic fluid medium for cooling applications. This heat exchanger has failed three times in six years. We have two schools of thought here: One believes that the temperature swings inherent to our process are the cause of the equipment failure, while the other feels that it is something else. Should we go to a shell and tube solution? If not a shell and tube, then what? Some of our concerns are maintaining current cooling capabilities, changeover, and sheer available space for installation.

--from May 2004 CONTROL

 Solution

I would never use a plate and frame heat exchanger for an application with temperature swings. Are they approach temperature limited? Probably. It is hard to get very tight approach temper-atures with a shell-and-tube since true counter current is almost impossible. If they don't have room for shell-and-tube they would never have room for double pipe.

Maybe they need a shell and tube exchanger with a refrigerant loop so they can minimize surface area and still fit a U-tube in place.

How about this? Stand a U-tube straight up! In my experience we had a few like this.

They can't be in a fouling service. But I don't think this is true as they currently have a welded plate and frame.

Tim Holtan

Smart Signal

[email protected]

Sponsored Recommendations

IEC 62443 4-1 Cyber Certification – Why ML 3 is So Important

The IEC 62443 Security for Industrial Automation and Control Systems - Part 4-1: Secure Product Development Lifecycle Requirements help increase resilience for control systems...

Multi-Server SCADA Maintenance Made Easy

See how the intuitive VTScada Services Page ensures your multi-server SCADA application remains operational and resilient, even when performing regular server maintenance.

Your Industrial Historical Database Should be Designed for SCADA

VTScada's Chief Software Architect discusses how VTScada's purpose-built SCADA historian has created a paradigm shift in industry expectations for industrial redundancy and performance...

Linux and SCADA – What You May Not Have Considered

There’s a lot to keep in mind when considering the Linux® Operating System for critical SCADA systems. See how the Linux security model compares to Windows® and Mac OS®.