Nancy Bartels is Control's managing editor. You can her at [email protected] or check out her Google+ profile.Hierarchy is important. Your operators need to move from a general overview down to detailed information in a logical manner.
  • Level 1 is a process area overview that covers the operator's entire span of control. Operators should be able to tell at a glance the overall operational condition of the process for which they are responsible.
  • Level 2 screens show the sub-unit for which the operator is responsible. There should be a Level 2 screen for each major unit operation, such as a compressor, a reactor, a furnace, etc. These screens should show all the information and controls necessary to perform operator tasks for that unit.
  • Level 3 screens show all the detail about a single piece of equipment or process control scheme. These screens are used for diagnostic purposes.
  • Level 4 shows details of subsystems, sensors or components and/or miscellaneous information.

Sponsored Recommendations

Municipalities are utilizing inline total solids measurements to enhance sludge thickening, lower polymer usage and cut operational expenses.
Carbon dioxide is increasingly recognized as a vital resource with significant economic potential. While the conversion of carbon dioxide into products is still in its infancy...
Discover our wide range of temperature transmitters that convert sensor signals from RTDs and thermocouples into stable and standardized output signals!
An innovative amine absorption-based carbon capture process enables retrofitting of existing industrial facilities to reduce emissions in hard-to-abate sectors, with advanced ...