News from Nels...

April 26, 2007
Unfortunately, I was unable at the last minute to go to CSIA, breaking a long string of being there. But for those of you who are there, and the other Friends of Nels, he's written his first post operative blog post....
Unfortunately, I was unable at the last minute to go to CSIA, breaking a long string of being there. But for those of you who are there, and the other Friends of Nels, he's written his first post operative blog post.

Sponsored Recommendations

IEC 62443 4-1 Cyber Certification – Why ML 3 is So Important

The IEC 62443 Security for Industrial Automation and Control Systems - Part 4-1: Secure Product Development Lifecycle Requirements help increase resilience for control systems...

Multi-Server SCADA Maintenance Made Easy

See how the intuitive VTScada Services Page ensures your multi-server SCADA application remains operational and resilient, even when performing regular server maintenance.

Your Industrial Historical Database Should be Designed for SCADA

VTScada's Chief Software Architect discusses how VTScada's purpose-built SCADA historian has created a paradigm shift in industry expectations for industrial redundancy and performance...

Linux and SCADA – What You May Not Have Considered

There’s a lot to keep in mind when considering the Linux® Operating System for critical SCADA systems. See how the Linux security model compares to Windows® and Mac OS®.