"The theory, methods and benefits of performing these audits are universal." Using a 40-year-old, 400 MW power plant as example, ABB's Rich Vesel explained how any manufacturer or utility can find significant energy savings through the use of a comprehensive, plant-wide audit."We have a lot of aging plants nationwide that are 30, 40 and 50 years old, and their plantânet and grossâheat rates are gradually deteriorating, and so their costs are going up," Vesel explained. "There's also been a moratorium on new coal plant construction, and the EPA also announced in November 2010 that it's requiring that Best Available Control Technology (BACT) be applied to plants for energy efficiency improvement."
Typical opportunities in an average 400 MW, fossil-fired boiler unit from the 1970s include:
- Identify and correct leaks, cycle isolation and operability issues.
- Apply new motors and variable-frequency drives to (VFDs) to the largest pumps and fans.
- Apply advanced controls to O2, spray flows and controllability issues.
- Reduce house load of 25 MW to less than 20 MW.
- Improve net heat rate by more than 3% on average.
- Improve capacity by more than 6-12 MW at full output.
- Analyze against unit load, cost and sale profiles, using above improvements.
- Gain per-megawatt savings of $500,000 or more per year in additional capacity.
- Achieve conservative spectrum of project payback from less than six months to up to five years.
In the case of the specific coal-fired plant, ABB first examined its 40-year-old "boiler island" section and then its "turbine island" section. This involves a three-phase process, including 1) identifying savings and improvement opportunities, 2) compiling a prioritized energy management master plan, and 3) implementing, commissioning and sustaining projects recommended in the plan.
Once the original 47 improvements and savings opportunities were found, ABB helped the plant decide which five or 10 to do first based on the investment required, how quickly they could be done, and how big a savings they could generate.
ABB's audits are thorough because they extract and analyze longer-term operations data, Vesel added. "We'll check a plant's PI software historian for a year's worth of data, and this will show trends that don't appear in an application's usual thermal models. Controllable losses can account for 50% of the difference between how a plant is performing and how its engineers and manager would like it to be performing."