How contextualized plant data can improve industrial energy management

The 7 Steel UK project exemplifies how connecting energy data with production and operational information can help manufacturers identify inefficiencies, manage energy costs and improve plant performance

If manufacturers want to curb rising energy costs, they first need to know where inefficiencies are hiding. That is the premise behind a partnership between inControl Systems, which provides fire-protection systems, and Rockwell Automation, which helps operators connect aging control systems and disparate data.

Graham Jennings, digital solutions director at inControl Systems, presented the case history of a deployment at 7 Steel UK, a low-carbon steelmaker that transforms scrap into steel products. At Rockwell Automation’s Automation Fair 2026, Jennings explained how contextualized energy and production data can help identify inefficiencies.

For a steelmaker operating an electric arc furnace (EAF), energy is a significant production cost. At its Cardiff operation, 7 Steel UK collected sufficient energy data, but much of it was aggregated into a single figure. Reports offered little detail about where energy was consumed or how it related to production.

Older plants often have control systems from multiple suppliers and different generations, with energy data spread across meters, programmable logic controllers (PLCs) and other systems. “The biggest challenge we have is the maturity of the companies that we serve,” Jennings said. “Their data is inherently from a lot of older PLCs and disjointed PLCs, different brands, different models, and data in different points.”

Connecting those sources means combining operational technology (OT) data with production, enterprise resource planning (ERP) and manufacturing execution systems (MES), then organizing everything around the processes they describe.

Adding context to energy data

At 7 Steel UK, inControl worked with Rockwell Automation to deploy FactoryTalk Energy Manager, an energy-management application built on Rockwell’s FactoryTalk DataMosaix Industrial DataOps platform. Energy Manager contextualizes energy information with production data and provides reporting, alarm-threshold monitoring and energy-intensity metrics. DataMosaix integrates information from sources such as control systems, historians, MES/MOM and enterprise applications.

Jennings described FactoryTalk Optix as part of the wider architecture, providing HMI, visualization, IIoT connectivity and edge capabilities between plant-floor equipment and the cloud-based data environment.

Of course, a rise in energy consumption does not, on its own, explain what has changed. Jennings pointed to factors such as production rates, equipment conditions, operating schedules, weather and energy tariffs that can all influence consumption. Without that context, engineers and plant managers must investigate the numbers themselves. “The worst thing is just present to them 100 charts and say, okay, you go and figure out what this is supposed to tell you,” Jennings explained. “It's now more about correlations.”

DataMosaix uses connectors and flexible data models to bring information from different systems into a common environment. The same environment can support energy management, overall equipment effectiveness (OEE) and batch monitoring.

For 7 Steel UK, correlating energy consumption with production data helps the company understand how energy intensity and cost-per-ton change as production levels and electricity prices fluctuate. That information informs decisions about scheduling energy-intensive activities during lower-tariff periods. Real-time reports and alarms help teams more rapidly identify unusual consumption patterns.

This project is ongoing, with data available across the site’s main loads and work continuing to extend visibility into subsystems. The system supports timely reporting, energy-intensity metrics and the company’s efforts toward ISO 50001 certification. Jennings also highlighted improved visibility, peak-load monitoring and more timely billing verification as additional wins. 

Finding the cost of inefficiency

Jennings then pointed to a separate project at Singleton Birch to illustrate the cost of an undetected operational problem. Singleton Birch operates four large calcination kilns that look physically identical but performed differently under varying conditions. One issue the team identified was the declining gas-burn efficiency as burner nozzles wore down and eventually failed. As efficiency deteriorated, more gas was needed to generate the same amount of heat. “The cost when that happened was astronomical,” Jennings said. He described “a 200% to 300% increase in gas just to create the same amount of heat.”

The objective was to identify the decline before equipment reached that point. Jennings detailed how avoiding the resulting performance loss contributed to double-digit energy savings, not to mention the sustainability gains. He stressed how rising gas consumption may signal deteriorating equipment performance rather than a change in production demand, a cause that can remain hidden in aggregated figures.

Data can reveal equipment running after production has stopped or production losses associated with staffing shortages. Jennings cautioned against reducing the value of these projects to a single return-on-investment figure. Savings depend on the equipment, process, operating conditions and actions taken after an issue is identified. Automating data collection can also free engineers and operators from compiling spreadsheets, giving them more time to investigate problems and improve operations.

Integration, skills and operational safeguards

Legacy plants often have accumulated control systems, naming conventions and data structures that were introduced at different times and may not align. This is not ideal. Making that disparate information usable requires input from engineers familiar with the equipment and processes, as well as an approach to data access that meets the plant’s security and governance requirements.

Jennings said inControl works alongside customers to map and standardize legacy data while maintaining their existing IT-security requirements. He identified ISO 27001 and the EU Cyber Resilience Act as considerations for securing digital deployments. At 7 Steel UK, the energy-management work also supports the company’s ISO 50001 objectives.

The project requires OT expertise in controls, PLCs and process operations, alongside IT skills in software engineering, data models and connectivity. Manufacturers may understand their processes, but lack developers experienced in Python, APIs and cloud applications. inControl combines industrial engineers with IT and software specialists to deliver comprehensive solutions.

And while artificial intelligence can help accelerate software development and deployment within the digital platform, Jennings drew a clear boundary between using AI to support engineering work and allowing cloud applications to make automatic changes to industrial control systems.

“It's a very, very dangerous industry,” he cautioned. “You don't just start making changes on PLCs from cloud solutions without a lot of pre-thought and planning and understanding what the constraints need to be, and the guardrails in place to support that.”

The data to enhance energy management exists, naturally. The challenge—the opportunity, actually—is in contextualizing that data to fully, safely, strategically capitalize on the insights hidden within it.

About the Author

Rehana Begg

Machine Design

Rehana Begg is editor in chief of Machine Design, an EndeavorB2B brand.